„With WSCAD, we have a tool that helps us do just that: quickly, easily, and reliably.“
At Rotkäppchen Sektkellerei, a Sparkling wine producer in Freyburg, production is all about precision and uptime. On two lines, up to 600,000 bottles are filled daily—a process with virtually no tolerance for downtime. To ensure reliable operations and minimize revenue loss, faults must be pinpointed fast and outages kept short. Since plant documentation exists only in paper or PDF format, the maintenance team is digitizing supplier-provided drawings step-by-step using WSCAD’s electrical CAD solution, laying the foundation for fast, modern maintenance workflows.
This case study is intended exclusively for your personal use. Any reproduction or publication requires our express written consent.






